Electricity and CBAM
Electricity is one of the six CBAM sectors. Its treatment has sector-specific rules, so a general goods workflow should not be assumed to cover every electricity case.
Confirm the relevant CN classification for electrical energy.
Document the origin and the relevant import/interconnection context.
Determine which emissions value and methodology are applicable to the case.
Keep the underlying data and assumptions used in the assessment.
Before using a cost estimate
- Confirm scopeCheck the current EU CBAM rules and product classification.
- Confirm emissions methodElectricity has specific conditions around emissions calculations and use of actual values.
- Record assumptionsKeep the source and date for each regulatory or emissions input.
Use the calculator as a planning aid only. Electricity cases can require sector-specific analysis beyond a generic tonnes-based goods model.